Yes. Grid-connected rooftop systems in Dubai are connected under DEWA’s Shams Dubai programme and must be installed by a DEWA-enrolled contractor. AVSG is a DEWA Approved Contractor and handles the approvals and permits for you. Other emirates have their own utility approvals (SEWA, ADDC/AADC, EtihadWE).
Under Shams Dubai net metering, electricity your system exports is offset against the electricity you import on the same DEWA bill. DEWA does not pay cash for exported energy, so systems are sized to your consumption. Rules differ by emirate, and we explain the scheme that applies to your property.
Typical payback is 5–7 years for villas and 3–5 years for commercial and industrial systems, depending on your tariff, consumption, roof and system size. We confirm the exact figure after a bill analysis and site survey.
Panels, inverters, batteries and EV chargers from world-class brands including Jinko, LONGi, Trina Solar, Huawei, Sungrow, BYD and Dahua, with panel warranties of 25–30 years.
Yes. Hybrid systems with LiFePO4 battery storage (5–20 kWh options) and AC/DC EV chargers from 7 kW to 120 kW can be installed with a new system or added to an existing one.